Sample for Keith to review. Draft advice copy. Replace or approve before going live.

Programming

A first WinProladder project on a new Fatek main unit

23 August 2026

Sample article for review. WinProladder is the same software for B1 and FBs. The first hour on a new main unit is usually wiring, comms and a trivial program — not the finished machine logic.

Before you connect

Fit the 24 VDC supply, check the port (RS-232 on many compact units), and install the current WinProladder build from the Fatek downloads area. Keep a USB-to-serial lead in the kit; the programming port is not Ethernet on the economical B1-10.

First download

Create a new project for the exact CPU, add one input and one output, and confirm you can force them. Only then import a previous machine project or start the real sequence. Mixing CPU types in an old project is a common reason a first download fails.

Rosehill can supply the main unit, the cable, and the download link. We do not rewrite your ladder for you unless that is a separate job.

← All articles