
Getting started
Choosing a compact Fatek PLC: B1-10 or FBs?
Sample for review
A short guide to when the economical B1 main unit is enough, and when an FBs advanced unit is the safer specification.
Advice
Short practical notes on specifying Fatek PLCs, HMIs and expansion from Rosehill Electronics. These five articles are sample copy for Keith to review — not finished published advice.

Getting started
Sample for review
A short guide to when the economical B1 main unit is enough, and when an FBs advanced unit is the safer specification.

Hardware
Sample for review
The B1 main unit sits in the middle of the DIN rail. Analogue goes left, extra digital goes right — without a larger cabinet.

HMI
Sample for review
Many UK machines already run a Fatek PLC. The next step is often a readable colour HMI, not a full controller rewrite.

Programming
Sample for review
What to have on the bench before you power up a new B1 or FBs PLC, so the first download is uneventful.

Control
Sample for review
Standalone PID instruments are familiar, but they do not share setpoints or faults with the rest of a Fatek machine.